Saturday 12 March 2011

W T Henley/ A.E.I cable works.


After visiting the air raid shelter I decided it was time to go and have a look around the cable works. It was a good explore and made for some good pictures. A very enjoyable day and a good way to finish the road trip.

Sunday 6 March 2011

A.E.I Henley's Air Raid Shelter, Feb 2011.


After a few days of planning me and Trog had decided we should go and have a little look around. After talking to Wevsky we managed to get abit of a road trip going. On arival we found that construction site was in use that day but decided to try and sneak round to the enterance. Although this was the plan things worked out a little differently but we all still manged to get in.